Piping life Cycle "Inspection Program Set-up, monitoring and Repair"- Part 3

In part 3 of their piping mini series Frank goes crossed-eyed during his attempt at an intro, and mixes up his process flow diagrams with piping and instrument diagrams. 

They start off with a "quick" recap of Part 2, and jump right into piping circuitization, possible locations to start and end your piping circuits. A few key items to check while completing your inspections and hint at a few resources to check out if process information is slim to help you get your corrosion surveys started.

They also touch on how to create your circuit drawings and the importance of keeping them updated.


We are also on instagram and linked-in
https://www.linkedin.com/in/man-watch-required
https://www.instagram.com/manwatch_required

Previous
Previous

“The waiting Game” back into TA with special guest Ryan

Next
Next

Piping life Cycle "Installation and starting your Inspection Program"- Part 2